Renovating a flat in Milan: stages, costs and checks
A guide to renovating a flat in Milan: stages, CILA permits, costs by item, choosing a contractor and keeping the works under control step by step.

You are looking at the floor plan of a flat in Milan, perhaps fresh out of an auction or put forward by an estate agent, and the conversation immediately turns to parquet and the kitchen. The real bill lies elsewhere. Planning, land registry and energy compliance weigh on the budget more than the finishes do, and they need to be settled before anyone picks up a hammer.
Contents
- The stages of renovating a flat in Milan
- Which permits a Milan flat really needs
- What data you need before costing the work
- How long it takes to renovate a flat in Milan
- How to choose the contractor and keep the site under control
- Mistakes to avoid and questions before signing the building contract
The stages of renovating a flat in Milan
Anyone renovating a flat in Milan pays for every mistake twice: once at the permit stage, and once on site. That is why I work through seven gates, in this order, and none of them gets skipped.
- Survey and document check. The surveyor measures the property as it stands and sets it beside the land registry floor plan and the building permits on file. The surveyor signs the survey. Allow a few weeks, not an afternoon.
- Classifying the works and filing with the Comune (city council). This is where you establish whether a CILA (Comunicazione di Inizio Lavori Asseverata, a certified notice of start of works) is enough, or whether a heavier permit is needed. It is filed by a qualified professional.
- Systems and energy design. This is where the pre-works APE (attestato di prestazione energetica, the energy performance certificate) comes in: it captures the property’s consumption before the works and serves as the baseline for measuring the improvement.
- Bill of quantities. Quantities measured item by item. A lump-sum total always hides some missing work.
- At least three quotes for the same work and the same materials. If the items differ, the comparison is worthless.
- Schedule. Permits, supplies, inspections. Payments stay tied to progress milestones, never to calendar dates.
- Close-out. Completion of works, land registry update, system certificates. The surveyor signs and, where needed, the notary signs the deeds.

The order matters because a missing document halts the site more than a late delivery does. Permits and design often take months before the first pickaxe, and they need to be estimated with the surveyor case by case. People who skip them to get started straight away end up paying for demolition already done in order to rebuild differently.
Who signs what, and what not to confuse
The surveyor signs the survey and the permit filing. The contractor prices the bill of quantities, but the quantities are checked by whoever is managing the works. The notary deals with the title deeds and, if needed, with the compliance that has to be transferred. The notary is not the site manager.
Watch out for a distinction that is often missed. Land registry compliance is not planning compliance: the land registry record can look in order while the building permit describes a different layout. Before the building contract, you need to check permits, discrepancies, condominium restrictions, drains, bathroom ventilation and electrical capacity.
Site rule: no gate is passed with a document missing. A variation after demolition cannot be absorbed into the “turnkey total”.
In the budget I keep works, design, works management, fees, VAT, contingencies and condominium works separate, because mixing them makes every quote impossible to compare. The 9 projects carried out between Milan and Bresso, from the first one onwards, are collected in our renovation and value-add projects in Lombardy.
Which permits a Milan flat really needs
The hammer comes later. In Milan, the permit you need is read from the building permit history, not from the finishes you want to move. Many internal works count as light extraordinary maintenance, and the Comune di Milano points to the CILA. The qualified professional declares, under their own responsibility, compliance with planning instruments, building regulations, seismic rules and energy performance rules.
The CILA covers moving internal walls, opening doorways and adding to plumbing, sanitary and technical systems. The condition is strict: volume, building outline and façades stay unchanged, structural elements are not touched and the use does not change in any way that matters for planning purposes.
A load-bearing wall is not a partition. It must be checked before any demolition, in the Navigli area just as in a condominium in Bresso, because a chase cut in the wrong place turns a CILA into a structural problem.
When a low price tells you nothing
A former ground-floor shop in the Navigli area can look like a bargain: a low asking price, a layout that “turns into a home” on paper. The Comune di Milano treats a change of use that matters for planning purposes in the homogeneous A zones as heavy renovation too, and the applicable regime may be a building permit (permesso di costruire) or an alternative SCIA (Segnalazione Certificata di Inizio Attività, a certified notice of start of activity).
Before the design, I check planning use, ceiling heights, light and ventilation ratios, accessibility, restrictions and fees. If any of these does not add up, the margin disappears before the specification is even written. The final permit route is confirmed by the surveyor. For legal matters, a notary or lawyer.
| Type of works | Indicative permit | When it changes |
|---|---|---|
| Non-structural partitions, doors, plumbing and sanitary systems | CILA | Outline, volume and façades unchanged |
| Structural elements or load-bearing walls | SCIA, to be confirmed with the qualified professional | Structural works, case by case |
| Heavy renovation | Building permit or alternative SCIA | Significant changes to outline or volume |
| Change of use from office or shop to home | Alternative SCIA or building permit | Use, health and sanitary requirements and fees |
What data you need before costing the work
A quote without energy figures is an opinion. In Lombardy I start from a pre-works APE, or a pre-works simulation, produced with the regional CENED+2.0 engine and signed by a certifier on the official register. Then I check the design with a post-works simulation on the same system. The Catasto Energetico Edifici Regionale (regional building energy register) collects the APEs produced with that engine, so the state of the property stays on record before and after the works.
The sequence I use is this. Geometric and systems survey, building envelope data, pre-works APE, alternatives, bill of quantities, post-works simulation, final check. Skipping a step means signing a quote on a baseline you have not measured.
The mistake that inflates the energy class
Simulating only the flat, and ignoring façades, roof, thermal bridges and the central heating system, produces an overly optimistic post-works energy class. The extra costs arrive when the chases are opened. The check has to separate what you control from what remains the condominium’s.
External wall insulation or window replacement that touches common parts is not a job for you alone. Ask the surveyor to confirm how much of the condominium’s building envelope falls within the works before designing them, because the permit, the residents’ meeting approval and the costs all depend on it. Comparing pre- and post-works performance is the same criterion Quantum RE uses to document the sustainability of its value-add projects.
How to read quotes
I compare the purchase price with the OMI values (Osservatorio del Mercato Immobiliare, the property market observatory) of the Agenzia delle Entrate (Italian Revenue Agency), for the area’s year and half-year, not with the neighbour’s listing. The shares below are market estimates for checking quotes, not official data. Fees, VAT and contingencies sit outside the works items. Contingencies are not spent before you know what comes out of the demolition.
| Item | What it includes | Indicative share (estimate) |
|---|---|---|
| Demolition and disposal | Floors, walls, false ceilings, rubble removal | 5-10% |
| Electrical system | Consumer units, conduits, available power | 10-15% |
| Plumbing and drains | Risers, connections, bathroom and kitchen | 10-15% |
| Heating and air conditioning | Boiler or heat pump, radiators or split units | 10-20% |
| Screeds, flooring, wall tiling | Subfloor, laying, skirting boards | 15-25% |
| Windows and insulation | Window frames, shutter boxes, internal or external insulation | 10-20% |
| Bathrooms and kitchen | Sanitaryware, shower trays, fitted units | 15-25% |
| Design, works management, permits | Qualified professionals and council permits | 8-15% |
| Fees, VAT, contingencies | Council fees, statutory VAT, margin for variations | Separate item, added to the total |
The question to put to every contractor is blunt. Does the quote give quantities and brands for each item, or just a total?
How long it takes to renovate a flat in Milan
The ranges here are estimates. The real schedule is signed by the surveyor, not taken from an average read online.
- Survey and document check. A few weeks. If the permits and the floor plan do not match, this stage stretches out on its own.
- Design, permit and quotes. One to three months, estimate. A CILA is filed before the start. A heavier permit pushes the start back.
- Works on site. Two to four months, estimate, for a flat of about 70 square metres with the bathroom and kitchen redone. Windows, a boiler or a heat pump add delivery times that do not depend on the contractor on site.
- Inspection and close-out. Land registry update and certificates after completion of the works, not “shortly”.
Why timelines slip
Three causes come up almost every time. Late deliveries. Variations uncovered by demolition, pipes and screeds that were not on the plan. Systems that have to be adapted to the power available in the condominium, and that paperwork is not the bricklayer’s call.
Keep a safety margin on the schedule and put it in writing with the works manager before promising a date to whoever is moving in.
A vacant flat in a 1970s condominium in Monza does not have the same timeline as an occupied lot in enforcement proceedings in Pioltello. The offerta minima (minimum bid) is only the threshold for taking part in the sale. It does not include months of vacating the property, nor the regularisation.
How to choose the contractor and keep the site under control
The lowest quote is often the one that describes nothing. On a Milan flat I check five things, and if one is missing I do not sign.
- Three quotes on the same bill of quantities. Not three site visits with different impressions. If the items do not match, the comparison is theatre.
- Documents, not a handshake. Registration with the Camera di Commercio (Chamber of Commerce), DURC (Documento Unico di Regolarità Contributiva, the certificate of social security compliance), public liability insurance, references from finished sites with address and photos.
- Written specification. Items, brands, quantities, delivery times, penalties. A single total is not a specification.
- Payments by SAL. The stato di avanzamento lavori (progress milestone) limits advance payments. Bank transfers are traceable. No cash “to release the delivery”.
- Independent works management. The professional doing the checking is not the contractor doing the work. It is the cheapest conflict of interest to avoid.
On site I ask for weekly photos and a signed record of the stages that will later be hidden. Concealed systems, drains, waterproofing, bathroom ventilation.
If the contractor will not accept a stage record, that is a warning sign to take seriously. It is not a formality.
Every variation is written down, priced and signed before it is carried out, even if “it’s only two days’ work”. I check the tax and contractual side with an accountant or notary, not with the site foreman. For checking the documents before signing, the starting point is our property consultancy.
Mistakes to avoid and questions before signing the building contract
A low entry price can hide the real risk of a building contract: planning feasibility. The cost of the works is estimated and negotiated item by item. An uncertain permit position is paid for after signing, and it weighs on the margin more than any finish.
- Mistaking an updated floor plan for a building permit. The land registry describes, planning authorises. They are two different checks, and the second decides whether the project can go ahead.
- Looking only at the entry price. Regularisation, time and fees are exit costs: they belong in the numbers before the offer.
- Ignoring the common parts. Drains, flues and bathroom ventilation run through the condominium. Without a resolution from the residents’ meeting, the new bathroom remains a drawing.
- Buying a non-residential space without the change of use. Fees and upgrades can wipe out the margin. If the conversion is uncertain, I pass and look for another property.
For legal and tax matters you need a notary, lawyer or accountant: that opinion is not settled on site.
Quantum RE, a Milan property company founded by Gianluca Falduto, works on properties in Milan and Lombardy, including auction properties. Its first project in Milan dates from 2018 and since then it has carried out 9 projects between Milan and Bresso. The QRE method brings together document checks, comparison with the real market, three scenarios and a reasoned verdict, with no promises of returns.
Questions before signing
Does repainting need a permit? Generally not. Still, ask the surveyor to confirm, especially if the work affects façades or common parts.
How long does a renovation take? It depends on the permit, the supplies and what comes out of the demolition. A signed schedule is worth more than a “standard” duration.
Who decides on condominium works? The residents’ meeting, on a proposal from the building manager. The specification does not replace the resolution.
Do I need a permit to knock down a partition wall? If the partition is not structural and you do not change the outline, volume or use, a CILA is normally enough. The surveyor checks whether the wall is load-bearing.
Is the auction valuation enough to tender the works? No. The perizia (court valuation report) describes the property for the sale, and the avviso di vendita (notice of sale) sets the auction rules. Neither is a bill of quantities.
Does a saldo e stralcio also settle the works? No. A saldo e stralcio (a negotiated debt settlement) is an agreement on the debt, to be reviewed with a lawyer. The works remain a separate contract.
If you are considering a flat in Milan or Lombardy, the QRE Analysis reads the documents and compares real prices before you sign the building contract or make an offer. It costs €350, deducted from the fee if the engagement follows, and you can request it from Quantum RE.